MORESSA, MODESTO
MORESSA, MODESTO
ASR - Direzione Generale
Allegato A - Specifiche Tecniche - CONTRATTO ANNUALE PER LA MANUTENZIONE E ASSISTENZA DELLE APPARECCHIATURE DELLE RETI RFX E NBTF - 2023
2023 Barbato P.; Moressa M.
As built design of the control systems of the ITER full-size beam source SPIDER in the neutral beam test facility - A critical review
2023 Luchetta, A; Taliercio, C; Cruz, N; Martini, G; Manduchi, G; Rigoni, A; Trevisan, L; Paolucci, F; Labate, C; Breda, M; Capobianco, R; Moressa, M; Molon, F; Sartore, A; Simionato, P; Zampiva, E; Barbato, P; Carraro, M; Migliorato, L
As built design, commissioning and integration of the SPIDER and NBTF central safety systems
2023 Luchetta, A; Dal Bello, S; Battistella, M; Grando, L; Moressa, M; Paolucci, F; Labate, C; Agnoletto, G
Final Design of MITICA Central Safety System
2023 Luchetta A.; Moressa M.; Grando L.; Battistella M.
Final Design of the Safety System of the Prototype of the ITER Negative-Ion Heating Neutral Beam Injector
2023 Luchetta, A; Battistella, M; Dal Bello, S; Grando, L; Moressa, M; Paoloucci, F; Labate, C
Functional safety assessment process for MITICA safety system in the ITER neutral beam test facility
2023 Grando, L; Battistella, M; Bello, Sd; Luchetta, A; Moressa, M; Munari, S; Gueccia, A; Piccini, M
Manufacturing Design of the MITICA Slow Interlock System and Thermal Unit - Anex B - Technical Specification
2023 Luchetta, A; Moressa, M
MITICA Cable Trays and Cabling - As-Built Design Report
2023 Barbato, P; Moressa, M; Luchetta, A; Zampiva, E
MITICA Networks - As-Built Design Report
2023 Barbato, P; Luchetta, A; Moressa, M
As built design, commissioning and integration of the SPIDER and NBTF central safety systems
2022 Luchetta, A; Battistella, M; Dal Bello, S; Grando, L; Moressa, M; Paolucci, F; Labate, Cv
Final and Manufacturing Design of Cable Trays and Cabling for MITICA CODAS, Central Interlock, Safety Systems and Thermal Unit
2022 Barbato P.; Moressa M.; Zampiva E.; Luchetta A.
Final Design of MITICA Central Interlock Network and Central Safety Network
2022 Moressa M.; Luchetta A.
Final Design of MITICA Central Safety System
2022 Luchetta, A; Moressa, M; Grando, L
Functional safety assessment process for MITICA safety system in the ITER neutral beam test facility
2022 Grando, L; Battistella, M; Dal Bello, S; Luchetta, A; Moressa, M; Munari, S
Interface Signals of MITICA Central Interlock with Plant Systems
2022 Luchetta A.; Moressa M.
MITICA Central Safety Preliminary Design
2022 Battistella M.; Grando L.; Moressa M.; Luchetta A.
MITICA Interlock Final Design
2022 Luchetta A.; Moressa M.; Grando L.
MITICA Interlock Preliminary Design
2022 Moressa, M; Luchetta, A
Preliminary Design of MITICA Computers and Data Storage
2022 Barbato P.; Gitini S.; Moressa M.; Luchetta A.; Taliercio C.
Safety Instrumented Functions of MITICA Central Safety
2022 Battistella M.; Grando L.; Moressa M.; Luchetta A.