CARRARO, MANOLA
CARRARO, MANOLA
ASR - Direzione Generale
Mostra
records
Risultati 1 - 2 di 2 (tempo di esecuzione: 0.005 secondi).
As built design of the control systems of the ITER full-size beam source SPIDER in the neutral beam test facility - A critical review
2023 Luchetta, A; Taliercio, C; Cruz, N; Martini, G; Manduchi, G; Rigoni, A; Trevisan, L; Paolucci, F; Labate, C; Breda, M; Capobianco, R; Moressa, M; Molon, F; Sartore, A; Simionato, P; Zampiva, E; Barbato, P; Carraro, M; Migliorato, L
Partial discharges detection in 1 MV power supplies in MITICA experiment, the ITER heating neutral beam injector prototype
2022 Boldrin, M; Dan, M; Toigo, V; Zanotto, L; Barbato, P; Baseggio, L; Carraro, M; Ghiraldelli, R; Zerbetto, E; Malgarotti, S; Rizzi, A; Rizzi, G; Decamps, H; Tobari, H
| Titolo | Data di pubblicazione | Autore(i) | File |
|---|---|---|---|
| As built design of the control systems of the ITER full-size beam source SPIDER in the neutral beam test facility - A critical review | 1-gen-2023 | Luchetta, A; Taliercio, C; Cruz, N; Martini, G; Manduchi, G; Rigoni, A; Trevisan, L; Paolucci, F; Labate, C; Breda, M; Capobianco, R; Moressa, M; Molon, F; Sartore, A; Simionato, P; Zampiva, E; Barbato, P; Carraro, M; Migliorato, L | |
| Partial discharges detection in 1 MV power supplies in MITICA experiment, the ITER heating neutral beam injector prototype | 1-gen-2022 | Boldrin, M; Dan, M; Toigo, V; Zanotto, L; Barbato, P; Baseggio, L; Carraro, M; Ghiraldelli, R; Zerbetto, E; Malgarotti, S; Rizzi, A; Rizzi, G; Decamps, H; Tobari, H |