This document describes in detail all the activities related to the demonstration phase of the CAUTION++ project. The aim of this phase is to check that the developed testbed addresses the requirements and desired functionalities, to test the performance of the CAUTION++ platform in a range of situations as wide as possible, and, in term, to prove the feasibility of the use of the CAUTION++ system in real situations. In the context of this demonstration phase of the project, three trials and three simulations will take place. These six activities cover the whole span of target technologies (GSM, GPRS, UMTS and WLAN), and intended objectives, avoiding where possible any overlapping, and aiming to obtain complementary results. All six demonstrations are fully described in this document, depicting each one of the scenarios designed to cover a specific scope, and highlighting the most fruitful results that prove all the concepts explored in the project.

CAUTION++ - Trial results and analysis

Di Giandomenico F;
2005

Abstract

This document describes in detail all the activities related to the demonstration phase of the CAUTION++ project. The aim of this phase is to check that the developed testbed addresses the requirements and desired functionalities, to test the performance of the CAUTION++ platform in a range of situations as wide as possible, and, in term, to prove the feasibility of the use of the CAUTION++ system in real situations. In the context of this demonstration phase of the project, three trials and three simulations will take place. These six activities cover the whole span of target technologies (GSM, GPRS, UMTS and WLAN), and intended objectives, avoiding where possible any overlapping, and aiming to obtain complementary results. All six demonstrations are fully described in this document, depicting each one of the scenarios designed to cover a specific scope, and highlighting the most fruitful results that prove all the concepts explored in the project.
2005
Istituto di Scienza e Tecnologie dell'Informazione "Alessandro Faedo" - ISTI
Rapporto intermedio di progetto
Trials
Planning
Scenarios
Performance
Testbeds
Network Monitoring
C.2.3 Network Operations
D.4.8 Performance
Trials
Testbeds
Network Monitoring
File in questo prodotto:
File Dimensione Formato  
prod_160931-doc_122729.pdf

solo utenti autorizzati

Descrizione: Trial results and analysis
Dimensione 5.82 MB
Formato Adobe PDF
5.82 MB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/166667
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact