Abstract: The construction phase of the instrument is going on schedule. The sample tank has been already dispatched to ISIS, the detector banks are in the assembling process, and the data acquisition electronics will be assembled next. We plan to transfer the material for the final assembling on site of the diffractometer within the end of December.
INES prima installazione ad ISIS
Grazzi F;Celli M;Colognesi D;Zoppi M
2004
Abstract
Abstract: The construction phase of the instrument is going on schedule. The sample tank has been already dispatched to ISIS, the detector banks are in the assembling process, and the data acquisition electronics will be assembled next. We plan to transfer the material for the final assembling on site of the diffractometer within the end of December.File in questo prodotto: