This report gives a summary of the activities performed at IFP/CNR during 2003 and 2004/2005 in accrodance with the contract and task agreement between the EUROPEAN ATOMIC ENERGY COMMUNITY and EURATOM/ENEA/CNR ASSOCIATION: Contract EFDA 03/1040 (FU 06-CT-2003-098) Art. 5.1 IDT No JW2-BEP-ENEA-26 The work described in this report is related to the participation in new JET mw-access diagnostic development, with particular reference to the design, construction test and installation of the Quasi-Optical interface boxes, the attendance to the contractual and working Meetings, the final report.

EFDA03-1040 2003-2004 report

ASimonetto
2006

Abstract

This report gives a summary of the activities performed at IFP/CNR during 2003 and 2004/2005 in accrodance with the contract and task agreement between the EUROPEAN ATOMIC ENERGY COMMUNITY and EURATOM/ENEA/CNR ASSOCIATION: Contract EFDA 03/1040 (FU 06-CT-2003-098) Art. 5.1 IDT No JW2-BEP-ENEA-26 The work described in this report is related to the participation in new JET mw-access diagnostic development, with particular reference to the design, construction test and installation of the Quasi-Optical interface boxes, the attendance to the contractual and working Meetings, the final report.
2006
Istituto di fisica del plasma - IFP - Sede Milano
___
File in questo prodotto:
File Dimensione Formato  
prod_238292-doc_61094.pdf

non disponibili

Descrizione: EFDA03-1040 Final Report
Dimensione 3.18 MB
Formato Adobe PDF
3.18 MB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/200308
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact