This report gives a summary of the activities performed at IFP/CNR during 2003 and 2004/2005 in accrodance with the contract and task agreement between the EUROPEAN ATOMIC ENERGY COMMUNITY and EURATOM/ENEA/CNR ASSOCIATION: Contract EFDA 03/1040 (FU 06-CT-2003-098) Art. 5.1 IDT No JW2-BEP-ENEA-26 The work described in this report is related to the participation in new JET mw-access diagnostic development, with particular reference to the design, construction test and installation of the Quasi-Optical interface boxes, the attendance to the contractual and working Meetings, the final report.
EFDA03-1040 2003-2004 report
ASimonetto
2006
Abstract
This report gives a summary of the activities performed at IFP/CNR during 2003 and 2004/2005 in accrodance with the contract and task agreement between the EUROPEAN ATOMIC ENERGY COMMUNITY and EURATOM/ENEA/CNR ASSOCIATION: Contract EFDA 03/1040 (FU 06-CT-2003-098) Art. 5.1 IDT No JW2-BEP-ENEA-26 The work described in this report is related to the participation in new JET mw-access diagnostic development, with particular reference to the design, construction test and installation of the Quasi-Optical interface boxes, the attendance to the contractual and working Meetings, the final report.File in questo prodotto:
| File | Dimensione | Formato | |
|---|---|---|---|
|
prod_238292-doc_61094.pdf
non disponibili
Descrizione: EFDA03-1040 Final Report
Dimensione
3.18 MB
Formato
Adobe PDF
|
3.18 MB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.


