This is an initial report on the fundamental practical hardware demonstration platform constraints. These constraints need to be adhered to by WP2-WP4 when setting properly justified system models, designing implementable algorithms and finding fundamental limits under realistic assumptions. The report covers both the Smart Meter Network demonstrator and the Critical Industrial Monitoring and Control demonstrator.
DIWINE Contract No. CNET-ICT-318177 Identification of practical system constraints D5.11
Stefano Savazzi
2013
Abstract
This is an initial report on the fundamental practical hardware demonstration platform constraints. These constraints need to be adhered to by WP2-WP4 when setting properly justified system models, designing implementable algorithms and finding fundamental limits under realistic assumptions. The report covers both the Smart Meter Network demonstrator and the Critical Industrial Monitoring and Control demonstrator.File in questo prodotto:
Non ci sono file associati a questo prodotto.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.


