This progress report contains the CAD package of the Instrumentation Feedthroughs and Connectors for MITICA and ITER HNB Injectors developed within the WP201 4 . This CAD development is based on q uality and technical requirements agreed with F4E and IO [ 1 , 2 , 3 ] , and on s pecific load combinations [ 4 ] . F urthermore, vacuum and R emote H andling (RH) guidelines and practice were applied [ 5 , 6 ] . Th e CAD solutions included in the present package are contextualised inside the MITICA vacuum vessel and are compatible also with ITER HNB injectors. De tail s of the in - vessel instrumentation are described in a special report [ 7 ] as well as for the high voltage feedthrough for the electrical biasing of the ERID [ 8 ] .
3D Model of Instrumentation Feedthroughs and Connectors for MITICA and ITER HNB Injectors
Dalla Palma M;
2015
Abstract
This progress report contains the CAD package of the Instrumentation Feedthroughs and Connectors for MITICA and ITER HNB Injectors developed within the WP201 4 . This CAD development is based on q uality and technical requirements agreed with F4E and IO [ 1 , 2 , 3 ] , and on s pecific load combinations [ 4 ] . F urthermore, vacuum and R emote H andling (RH) guidelines and practice were applied [ 5 , 6 ] . Th e CAD solutions included in the present package are contextualised inside the MITICA vacuum vessel and are compatible also with ITER HNB injectors. De tail s of the in - vessel instrumentation are described in a special report [ 7 ] as well as for the high voltage feedthrough for the electrical biasing of the ERID [ 8 ] .I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.