This document reports the results of the RFX review and integration activities on the Technical Specification for MITICA Cryopumps Lot 2 "Manufactu re of Expansion Profiles", as submitted by IO and F4E on 2 nd April 2015. A list of the main issues and of the main added par ts is first presented. Then the entire Technical Specification document with detailed comments, prop osed corrections and integrations is attached as Annex A to this document. This work has been performed in the framework of th e WP2015 Task 4.6 MITICA Cryopumps.
Review of Technical Specification: Manufacturing of the MITICA Cryopump Lot 2 Manufacture of Expansion Profiles
Zaccaria P
2015
Abstract
This document reports the results of the RFX review and integration activities on the Technical Specification for MITICA Cryopumps Lot 2 "Manufactu re of Expansion Profiles", as submitted by IO and F4E on 2 nd April 2015. A list of the main issues and of the main added par ts is first presented. Then the entire Technical Specification document with detailed comments, prop osed corrections and integrations is attached as Annex A to this document. This work has been performed in the framework of th e WP2015 Task 4.6 MITICA Cryopumps.File in questo prodotto:
Non ci sono file associati a questo prodotto.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.