This document reports the results of the RFX review and integration activities on the Technical Specification for MITICA Cryopumps Lot 1 "Main asse mbly and manufacture of the Cryopump", as submitted by IO on 28/10/2015. The Technical Specification document with detailed comments, proposed corrections and integrations is attached as Annex A to this documen t. This work has been performed in the framework of th e WP2015 Task 4.6 MITICA Cryopumps.
Manufacturing of the MITICA Cryopump Lot 1 Main Assembly and Manufacture of the Cryopump
Zaccaria P
2015
Abstract
This document reports the results of the RFX review and integration activities on the Technical Specification for MITICA Cryopumps Lot 1 "Main asse mbly and manufacture of the Cryopump", as submitted by IO on 28/10/2015. The Technical Specification document with detailed comments, proposed corrections and integrations is attached as Annex A to this documen t. This work has been performed in the framework of th e WP2015 Task 4.6 MITICA Cryopumps.File in questo prodotto:
Non ci sono file associati a questo prodotto.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.


