This document is the report for Deliverable T4.19/ P1 .2 of Work Programme 2015.It defines the advanced design for the MITICA Control and Data Acquisition System (CODAS). On 28-29 Nov. 2013 a meeting was carried out with IO and F4E to discuss the route to the development of MITICA CODAS and beyond of the ITER HNB Plant System I&C. As a guideline for WP2014, it was proposed to collect high level requirements from IO first and organize, possibly, a Conceptual Design Review with IO and F4E targeting the high level requirements in Q4 2014. Unfortunately, the procedure was not carried out during 2014/2015 and, thus, this report reflects only the RFX view and proposal. Moreover, the advanced design proposed in this document is still weak and will need to be addressed in detail in the future.
MITICA CONTROL AND DATA ACQUISITION SYSTEM Report on Advanced Design
Luchetta A;Manduchi G
2015
Abstract
This document is the report for Deliverable T4.19/ P1 .2 of Work Programme 2015.It defines the advanced design for the MITICA Control and Data Acquisition System (CODAS). On 28-29 Nov. 2013 a meeting was carried out with IO and F4E to discuss the route to the development of MITICA CODAS and beyond of the ITER HNB Plant System I&C. As a guideline for WP2014, it was proposed to collect high level requirements from IO first and organize, possibly, a Conceptual Design Review with IO and F4E targeting the high level requirements in Q4 2014. Unfortunately, the procedure was not carried out during 2014/2015 and, thus, this report reflects only the RFX view and proposal. Moreover, the advanced design proposed in this document is still weak and will need to be addressed in detail in the future.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.