This Technical Note describes the interface check that has been carried out between MITICA Vacuum Vessel CAD model and the WP 2016 version of the Cryopump CAD model received from F4E on 08/02/2016 through formal DET-03597. The contents included in this document integrate what reported in WP 2015 interface report T4.6-P1.1-RFX_MITICA_TN_313-Review and verification of interfaces of MITICA Cryopumps_r1. Changes to Cryopump design were applied by IO during 2015 so some new differences and interface issues have been found with respect to WP 2015 interface check.

Review and verification of interfaces of MITICA Cryopumps - WP 2016 update

Pasqualotto R;
2016

Abstract

This Technical Note describes the interface check that has been carried out between MITICA Vacuum Vessel CAD model and the WP 2016 version of the Cryopump CAD model received from F4E on 08/02/2016 through formal DET-03597. The contents included in this document integrate what reported in WP 2015 interface report T4.6-P1.1-RFX_MITICA_TN_313-Review and verification of interfaces of MITICA Cryopumps_r1. Changes to Cryopump design were applied by IO during 2015 so some new differences and interface issues have been found with respect to WP 2015 interface check.
2016
Istituto gas ionizzati - IGI - Sede Padova
Rapporto finale di progetto
Neutral Beam Test Facility
NBTF
MITICA
MITICA Cryopumps
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/324238
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact