In the framework of F4E contract OPE-351 with delta-ti S.p.A., the review of As Built document ation is currently in progress. Review of the As Built diagrams is part of a wide verification of the documentation produced by the electrical subcontractor Autec s.r.l. The notes from the review of Motor Control Centre 1 (MCC1 SHARED) have been attached to the back of this cover page an d are the result of a check carried out on site 22-24 November, with Autec s.r.l. in attendance.
Review of MCC1 diagram SHARED, ref. DW1492354-07
Lazzaro G
2017-01-01
Abstract
In the framework of F4E contract OPE-351 with delta-ti S.p.A., the review of As Built document ation is currently in progress. Review of the As Built diagrams is part of a wide verification of the documentation produced by the electrical subcontractor Autec s.r.l. The notes from the review of Motor Control Centre 1 (MCC1 SHARED) have been attached to the back of this cover page an d are the result of a check carried out on site 22-24 November, with Autec s.r.l. in attendance.File in questo prodotto:
Non ci sono file associati a questo prodotto.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.