In the framework of F4E contract OPE-351 with delta-ti S.p.A., the review of As Built document ation is currently in progress. Review of the As Built diagrams is part of a wide verification of the documentation produced by the electrical subcontractor Autec s.r.l. The notes from the review of Motor Control Centre 1 (MCC1 SHARED) have been attached to the back of this cover page an d are the result of a check carried out on site 22-24 November, with Autec s.r.l. in attendance.

Review of MCC1 diagram SHARED, ref. DW1492354-07

Lazzaro G
2017-01-01

Abstract

In the framework of F4E contract OPE-351 with delta-ti S.p.A., the review of As Built document ation is currently in progress. Review of the As Built diagrams is part of a wide verification of the documentation produced by the electrical subcontractor Autec s.r.l. The notes from the review of Motor Control Centre 1 (MCC1 SHARED) have been attached to the back of this cover page an d are the result of a check carried out on site 22-24 November, with Autec s.r.l. in attendance.
2017
Istituto gas ionizzati - IGI - Sede Padova
Rapporto finale di progetto
neutral beam test facility project
NBTF
SPIDER
MITICA
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/335345
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact