This document is the final report relative to the Work Package 3 (WP3 "Mating operations") for the industrial research project (IRP) named "Catamaran Float-Over Tests & Simulations: Mating Operations and Hydrodynamic Tools Revision" (TECHNIP Purchase Order ITENG000159) to support the Conceptual Design developed by Technip Italy (TPIT) who have awarded CNR-INSEAN on April 2016 to carry out the necessary activities. This deliverable focuses on the mating operations, reproducing experimentally the deployment of the topside on the jacket structure, once the Catamaran Float-Over (CFO) system has reached the final destination.

Catamaran Float-Over Tests & Simulations: Mating Operations and Hydrodynamic Tool Revision. Mating Operations - Final Report - part III.

Daniele DESSI;
2017

Abstract

This document is the final report relative to the Work Package 3 (WP3 "Mating operations") for the industrial research project (IRP) named "Catamaran Float-Over Tests & Simulations: Mating Operations and Hydrodynamic Tools Revision" (TECHNIP Purchase Order ITENG000159) to support the Conceptual Design developed by Technip Italy (TPIT) who have awarded CNR-INSEAN on April 2016 to carry out the necessary activities. This deliverable focuses on the mating operations, reproducing experimentally the deployment of the topside on the jacket structure, once the Catamaran Float-Over (CFO) system has reached the final destination.
2017
Istituto di iNgegneria del Mare - INM (ex INSEAN)
Seakeeping; Experimental analysis; Catamaran floatover; Decommissioning; Offshore; Asymmetric catamaran
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/337849
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact