As planned in the previous year, EDDI testing plan started with a round robin test campaign on EUROFER 97. The campaign of TENSILE testing was completed in Oct. 2016, and the data was discussed just after such term. The first real data requests have been presented during 2016, and namely creep tests on pre-fatigued specimens, LCF tests and fracture tests with a non-standard yoke/pin configuration. The real tests required have been prioritized and started in 2016.They will continue in 2017 with other tests (especially LCF) to be distributed to the different RUs following cost exigencies and results of the RR.
MAT-1.4.2-T3-D1 Summary overview document on Organization and Implementation of EDDI Testing Plan for 2016 (ENEA-CNR)
E Perelli Cippo;G Angella;R Donnini
2016
Abstract
As planned in the previous year, EDDI testing plan started with a round robin test campaign on EUROFER 97. The campaign of TENSILE testing was completed in Oct. 2016, and the data was discussed just after such term. The first real data requests have been presented during 2016, and namely creep tests on pre-fatigued specimens, LCF tests and fracture tests with a non-standard yoke/pin configuration. The real tests required have been prioritized and started in 2016.They will continue in 2017 with other tests (especially LCF) to be distributed to the different RUs following cost exigencies and results of the RR.File in questo prodotto:
File | Dimensione | Formato | |
---|---|---|---|
prod_381623-doc_129371.pdf
solo utenti autorizzati
Descrizione: Frontespizio
Dimensione
156.46 kB
Formato
Adobe PDF
|
156.46 kB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.