This document describes the main goals and the scheduled activities for the tests of the ITER Steady State Sensors to be carried out in WEST Tokamak. The preliminary actions to be carried out and a conceptual design of the sensors holder are presented. The document reports all the steps to be performed in order to do the tests on sensors and indicates a responsible for each deliverable. This work has been carried out in the framework of Task Order No. 05 "Engineering and coordination for the Outer Vessel Steady-state Sensors, PBS 55.A5/A6" [1], issued in accordance with the Framework Contract No. IO/16/CT/SAP 6000000181 for "Diagnostic Systems Engineering Services)". This document constitutes the Deliverable #01 of the Task Order.
Technical description of Hall sensors tests in WEST tokamak
Brombin M;Agostinetti P;
2017
Abstract
This document describes the main goals and the scheduled activities for the tests of the ITER Steady State Sensors to be carried out in WEST Tokamak. The preliminary actions to be carried out and a conceptual design of the sensors holder are presented. The document reports all the steps to be performed in order to do the tests on sensors and indicates a responsible for each deliverable. This work has been carried out in the framework of Task Order No. 05 "Engineering and coordination for the Outer Vessel Steady-state Sensors, PBS 55.A5/A6" [1], issued in accordance with the Framework Contract No. IO/16/CT/SAP 6000000181 for "Diagnostic Systems Engineering Services)". This document constitutes the Deliverable #01 of the Task Order.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.


