This report describes the high voltage tests carried out by Consorzio RFX (CRFX) personnel on the high voltage pipe break to be installed in the SPIDER H2/D2 line and for the MITICA HVD2. The activities reported in this document can be considered as the prosecution of those described in the technical note RFX_SPIDER_TN_401 where a series of pressure and electrical tests on a ceramic insulating break prototype are reported.

Electrical and Pressure Tests on Hydrogen insulating breaks

Fincato M;
2017

Abstract

This report describes the high voltage tests carried out by Consorzio RFX (CRFX) personnel on the high voltage pipe break to be installed in the SPIDER H2/D2 line and for the MITICA HVD2. The activities reported in this document can be considered as the prosecution of those described in the technical note RFX_SPIDER_TN_401 where a series of pressure and electrical tests on a ceramic insulating break prototype are reported.
2017
Istituto gas ionizzati - IGI - Sede Padova
Rapporto finale di progetto
neutral beam test facility
NBTF
MITICA
SPIDER
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/343497
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact