This document summarizes all the dimensional verifi cations and metrological activities carried out at PRIMA site aimed at verifying the interfaces between the SPIDER Beam Source (SBS) and the Vacuum Vessel (VV), including hydraulic and electrical bushings. In this document, the metrological report describin g the alignment activities of the Grounded Grid, ca rried out at PRIMA site, in support and collaboration with Th ales personnel, is also included. Finally, the metrological activities carried out du ring the installation of the Beam source in the Vacuum Vessel aimed at assuring the correct position of th e Beam Source itself are also reported.
SPIDER Beam Source dimensional verification and installation report PBS element: 53.SI.A1
Degli Agostini F;
2018
Abstract
This document summarizes all the dimensional verifi cations and metrological activities carried out at PRIMA site aimed at verifying the interfaces between the SPIDER Beam Source (SBS) and the Vacuum Vessel (VV), including hydraulic and electrical bushings. In this document, the metrological report describin g the alignment activities of the Grounded Grid, ca rried out at PRIMA site, in support and collaboration with Th ales personnel, is also included. Finally, the metrological activities carried out du ring the installation of the Beam source in the Vacuum Vessel aimed at assuring the correct position of th e Beam Source itself are also reported.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.