This document summarizes all the dimensional verifi cations and metrological activities carried out at PRIMA site aimed at verifying the interfaces between the SPIDER Beam Source (SBS) and the Vacuum Vessel (VV), including hydraulic and electrical bushings. In this document, the metrological report describin g the alignment activities of the Grounded Grid, ca rried out at PRIMA site, in support and collaboration with Th ales personnel, is also included. Finally, the metrological activities carried out du ring the installation of the Beam source in the Vacuum Vessel aimed at assuring the correct position of th e Beam Source itself are also reported.

SPIDER Beam Source dimensional verification and installation report PBS element: 53.SI.A1

Degli Agostini F;
2018

Abstract

This document summarizes all the dimensional verifi cations and metrological activities carried out at PRIMA site aimed at verifying the interfaces between the SPIDER Beam Source (SBS) and the Vacuum Vessel (VV), including hydraulic and electrical bushings. In this document, the metrological report describin g the alignment activities of the Grounded Grid, ca rried out at PRIMA site, in support and collaboration with Th ales personnel, is also included. Finally, the metrological activities carried out du ring the installation of the Beam source in the Vacuum Vessel aimed at assuring the correct position of th e Beam Source itself are also reported.
2018
Istituto gas ionizzati - IGI - Sede Padova
Rapporto finale di progetto
neutral beam test facility
NBTF
SPIDER
SPIDER accelerator and extractor
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/343829
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact