This document represents deliverable D1.3 of the Specific Contract F4E - OFC - 531 - 01 - Neutral Beam Test Facility Diagnostics, Task Order No.1: SPIDER Diagn ostics #1 . The description of the final layout and components , the installation activities and the results of the tests carried out for the thermal sensors on the Beam Source, Beam Dump and Vacuum Vessel are provided, in particular for the following subsys tems : - conditioning electronics in the HVD for sensors in the Beam Source ; - interface, cabling, feedthroughs & conditioning electronics for sensors provided by ITER INDA and installed on the cooling pipes of the HTEs of the Beam Dump ; - sensors, cabling & cond itioning electronics for Temperatu re measurements of the HTEs surface - sensors, cabling & conditioning electronics for Temperatu re measurements of the vacuum vessel.
Final report of the thermal diagnostic in SPIDER: Source, Beam Dump and Vacuum Vessel
Brombin M;Taliercio C;Zampiva E
2018
Abstract
This document represents deliverable D1.3 of the Specific Contract F4E - OFC - 531 - 01 - Neutral Beam Test Facility Diagnostics, Task Order No.1: SPIDER Diagn ostics #1 . The description of the final layout and components , the installation activities and the results of the tests carried out for the thermal sensors on the Beam Source, Beam Dump and Vacuum Vessel are provided, in particular for the following subsys tems : - conditioning electronics in the HVD for sensors in the Beam Source ; - interface, cabling, feedthroughs & conditioning electronics for sensors provided by ITER INDA and installed on the cooling pipes of the HTEs of the Beam Dump ; - sensors, cabling & cond itioning electronics for Temperatu re measurements of the HTEs surface - sensors, cabling & conditioning electronics for Temperatu re measurements of the vacuum vessel.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.