This document is part of deliverable D4.3 of the Specific Contract F4E - OFC - 531 - 01 - Neutral Beam Test Facility Diagnostics, Task Order No.1: SPIDER Diagnostics #1. The procedure and results of the acceptance test of the front end drawer series, after the delivery to the Consorzio RFX by the ELAD s.r.l. company, are shown for each drawer.
Inspection report of the Front End drawer for signal conditioning of SPIDER electrostatic probes PBS 53.SI.DS
Spolaore M;Taliercio C
2018
Abstract
This document is part of deliverable D4.3 of the Specific Contract F4E - OFC - 531 - 01 - Neutral Beam Test Facility Diagnostics, Task Order No.1: SPIDER Diagnostics #1. The procedure and results of the acceptance test of the front end drawer series, after the delivery to the Consorzio RFX by the ELAD s.r.l. company, are shown for each drawer.File in questo prodotto: