This document reports on the site acceptance tests of the SPIDER and PRIMA CODAS interface with the PRIMA Gas and Vacuum System (GVS). The tests were executed to check i) the SPIDER CODAS interface with GVS SPIDER plant unit (53.SI.GV) and ii) the PRIMA CODAS interface with GVS Shared plant unit (53.PR.G1 Gas Storage and Distributions System). We carried out an early test campaign during the PRIMA GVS Site Acceptance Tests in June 2017 by using miniCODAS. Tests were repeated during the SPIDER integrated commissioning of SPIDER/PRIMA CODAS with GVS SPIDER and Shared plant units that were executed in Oct.-Nov. 2017 by using the CODAS servers. The main purpose of these tests was to check the process variable exchange, the locale/remote switchover procedure and the remote sequences of the GVS plant integrated whit SPIDER/PRIMA CODAS. The tests of remote sequences were executed by setting the state transition requests through the CODAS graphical interface.

SPIDER/PRIMA CODAS interface with Gas and Vacuum System - SPIDER/Shared Plant Units - Test Report

Fincato M;Simionato P
2018

Abstract

This document reports on the site acceptance tests of the SPIDER and PRIMA CODAS interface with the PRIMA Gas and Vacuum System (GVS). The tests were executed to check i) the SPIDER CODAS interface with GVS SPIDER plant unit (53.SI.GV) and ii) the PRIMA CODAS interface with GVS Shared plant unit (53.PR.G1 Gas Storage and Distributions System). We carried out an early test campaign during the PRIMA GVS Site Acceptance Tests in June 2017 by using miniCODAS. Tests were repeated during the SPIDER integrated commissioning of SPIDER/PRIMA CODAS with GVS SPIDER and Shared plant units that were executed in Oct.-Nov. 2017 by using the CODAS servers. The main purpose of these tests was to check the process variable exchange, the locale/remote switchover procedure and the remote sequences of the GVS plant integrated whit SPIDER/PRIMA CODAS. The tests of remote sequences were executed by setting the state transition requests through the CODAS graphical interface.
2018
Istituto gas ionizzati - IGI - Sede Padova
Rapporto finale di progetto
neutral beam test facility
NBTF
SPIDER
PRIMA
NBTF Control Interlock and Safety
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/350651
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact