The Cryogenic Plant is under assembly at PRIMA site. All the cryogenic lines have been laid down also inside the MITICA Neutron Shield up to the positions where they shall be connected to Cryopumps flanges. The temporary positions of connecting flanges at the ends of cryogenic lines had to be measured with respect to the absolute reference axes of MITICA experiment, in order to get confidence about the feasibility of future connections at interfaces. To this aim, a measurement campaign has been performed in December 2018 by Consorzio RFX metrology team and the results are reported in this document.
MITICA Cryogenic Plant / Cryopumps connections layout and metrology measurements
Zaccaria P;Degli Agostini F;
2019
Abstract
The Cryogenic Plant is under assembly at PRIMA site. All the cryogenic lines have been laid down also inside the MITICA Neutron Shield up to the positions where they shall be connected to Cryopumps flanges. The temporary positions of connecting flanges at the ends of cryogenic lines had to be measured with respect to the absolute reference axes of MITICA experiment, in order to get confidence about the feasibility of future connections at interfaces. To this aim, a measurement campaign has been performed in December 2018 by Consorzio RFX metrology team and the results are reported in this document.File in questo prodotto:
Non ci sono file associati a questo prodotto.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.