This Inspection Report describes the measurements made on the COOLING PLANT flanges of the BLC, to measure their position with respect to the MITICA reference system and consequently to know how much they deviate from the corresponding flanges on the BLV.
Survey of BLC cooling pipes position at the interface with the BLV inside the MITICA BIOSHIELD
Degli Agostini F;
2018
Abstract
This Inspection Report describes the measurements made on the COOLING PLANT flanges of the BLC, to measure their position with respect to the MITICA reference system and consequently to know how much they deviate from the corresponding flanges on the BLV.File in questo prodotto:
Non ci sono file associati a questo prodotto.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.