This document describes the functional technical specification for the procurement of a portable equipment to dry the hydraulic circuits and components of SPIDER Beam Source as needed for major maintenance and upgrade activities. To be noted that this is a functional technical specification, so the Bidder can adopt or modify the proposed conceptual schemes according to its knowledge and experience. The Supplier shall develop and submit for approval a manufacturing design of the system that fulfils all the functional and specific requirements that are specified in this document. This document is the base for the preparation of procurement order in 2020. If necessary further requirements and requests will be added before issuing the call for tender. Some information highlighted in the text and some data in Tables are to be further verified with specific controls on-site inside the SPIDER Neutron Shield. These verifications are planned during the next short duration SPIDER shutdowns. After verifications an updated version of this document will be issued.

Functional Technical Specification for procurement of a Drying System for SPIDER Beam Source

Zaccaria P;Dalla Palma M;
2020

Abstract

This document describes the functional technical specification for the procurement of a portable equipment to dry the hydraulic circuits and components of SPIDER Beam Source as needed for major maintenance and upgrade activities. To be noted that this is a functional technical specification, so the Bidder can adopt or modify the proposed conceptual schemes according to its knowledge and experience. The Supplier shall develop and submit for approval a manufacturing design of the system that fulfils all the functional and specific requirements that are specified in this document. This document is the base for the preparation of procurement order in 2020. If necessary further requirements and requests will be added before issuing the call for tender. Some information highlighted in the text and some data in Tables are to be further verified with specific controls on-site inside the SPIDER Neutron Shield. These verifications are planned during the next short duration SPIDER shutdowns. After verifications an updated version of this document will be issued.
2020
Istituto per la Scienza e Tecnologia dei Plasmi - ISTP
Rapporto finale di progetto
Neutral Beam Test Facility
NBTF
SPIDER
SPIDER Beam Source
PRIMA Cooling Plant
F4E-RFX
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/383125
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact