The preliminary assembly plan prepared by ITER Organization [R1] describes the SBD interfaces, but it requires to be integrated by another document as lifting, drawing up, and positioning have to be carried out by using a lifting jig. Existing documents regarding SBD handling and installation have been analysed and remaining issues have been addressed as described in the present document. The on-site acceptance test plan has been developed considering component characteristics, installed sensors, and analysed risks [A1].
On-site Assembly, Installation, and Acceptance Test Plan of SPIDER Beam Dump
Dalla Palma M;Brombin M;Zaupa M
2019
Abstract
The preliminary assembly plan prepared by ITER Organization [R1] describes the SBD interfaces, but it requires to be integrated by another document as lifting, drawing up, and positioning have to be carried out by using a lifting jig. Existing documents regarding SBD handling and installation have been analysed and remaining issues have been addressed as described in the present document. The on-site acceptance test plan has been developed considering component characteristics, installed sensors, and analysed risks [A1].File in questo prodotto:
Non ci sono file associati a questo prodotto.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.