The deliverable D6.2 - Report on Design and specification of the SunHorizon demo sites is the only report included in T6.2 - Engineering and design of the demo sites. According to the DoA, Task 6.2 should have a twofold objective: -Schedule monitoring: to track the progress of each demo site, from the preparation of the detailed design until the deployment (to be then analysed in Task 6.3) taking into account both timing and legal issues (i.e. bidding/authorisation procedures); -Technical assessment of detailed design. In addition to the above-mentioned goals, T6.2 has supported the collection of information on the budget for each demo, to precisely define the boundaries of partners responsibility. The final figures are still needed to be inalised and have therefore been excluded from the present report. The figures will be then used to define possible budget reallocations among partners, to be formalised by means of an amendment. In the report, a chapter is dedicated to each demo site, focusing in particular on: -Description of the intervention and activity schedule: the final sizing of the components to be installed is reported, as well as a GANTT chart for the activities considering, design, deployment commissioning and monitoring phases. -Final design of the TP: articulated into high level design, detailed design and monitoring plan. -Architectural and structural aspects: such as the positioning of the components inside the demo building as well as any structural study carried out.

Report on Design and specification of the SunHorizon demo sites

2021

Abstract

The deliverable D6.2 - Report on Design and specification of the SunHorizon demo sites is the only report included in T6.2 - Engineering and design of the demo sites. According to the DoA, Task 6.2 should have a twofold objective: -Schedule monitoring: to track the progress of each demo site, from the preparation of the detailed design until the deployment (to be then analysed in Task 6.3) taking into account both timing and legal issues (i.e. bidding/authorisation procedures); -Technical assessment of detailed design. In addition to the above-mentioned goals, T6.2 has supported the collection of information on the budget for each demo, to precisely define the boundaries of partners responsibility. The final figures are still needed to be inalised and have therefore been excluded from the present report. The figures will be then used to define possible budget reallocations among partners, to be formalised by means of an amendment. In the report, a chapter is dedicated to each demo site, focusing in particular on: -Description of the intervention and activity schedule: the final sizing of the components to be installed is reported, as well as a GANTT chart for the activities considering, design, deployment commissioning and monitoring phases. -Final design of the TP: articulated into high level design, detailed design and monitoring plan. -Architectural and structural aspects: such as the positioning of the components inside the demo building as well as any structural study carried out.
2021
Istituto di Tecnologie Avanzate per l'Energia - ITAE
Rapporto intermedio di progetto
Energy
Solar
Heat pump
Efficiency
Experimental test
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/396906
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact