In [1] the first MIP exact formulation was provided that describes the convex hull of the solutions satisfying all the standard operational constraints for the thermal units: minimum up- and down-time, minimum and maximum power output, ramp (including start-up and shut-down) limits, general history-dependent start-up costs, and nonlinear convex power production costs. That formulation contains a polynomial, but large, number of variables and constraints. We present two new formulations with fewer variables defined on the shut-down period and computationally test the trade-off between reduced size and possibly weaker bounds.
Start-Up/Shut-Down MINLP Formulations for the Unit Commitment with ramp constraints
Tiziano Bacci;Antonio Frangioni;Claudio Gentile
2020
Abstract
In [1] the first MIP exact formulation was provided that describes the convex hull of the solutions satisfying all the standard operational constraints for the thermal units: minimum up- and down-time, minimum and maximum power output, ramp (including start-up and shut-down) limits, general history-dependent start-up costs, and nonlinear convex power production costs. That formulation contains a polynomial, but large, number of variables and constraints. We present two new formulations with fewer variables defined on the shut-down period and computationally test the trade-off between reduced size and possibly weaker bounds.File | Dimensione | Formato | |
---|---|---|---|
8.pdf
solo utenti autorizzati
Licenza:
NON PUBBLICO - Accesso privato/ristretto
Dimensione
176.69 kB
Formato
Adobe PDF
|
176.69 kB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.