This document represents deliverable D2.2.3 of the Specific Contract F4E-OFC-531-02 - Neutral Beam Test Facility Diagnostics, Task Order No.2: SPIDER Diagnostics #2 and MITICA Diagnostics #1. The final design and as built drawings of the electrostatic probe prototypes for MITICA beamline componentsare reported, together with documentation of the manufacturing phase and the verifications and tests meant to qualify and finalize the design before series production.

Final report of prototype probes for MITICA

Spolaore M;Brombin M;Dalla Palma M;Visentin M
2020

Abstract

This document represents deliverable D2.2.3 of the Specific Contract F4E-OFC-531-02 - Neutral Beam Test Facility Diagnostics, Task Order No.2: SPIDER Diagnostics #2 and MITICA Diagnostics #1. The final design and as built drawings of the electrostatic probe prototypes for MITICA beamline componentsare reported, together with documentation of the manufacturing phase and the verifications and tests meant to qualify and finalize the design before series production.
2020
Istituto per la Scienza e Tecnologia dei Plasmi - ISTP
Rapporto finale di progetto
Neutral Beam Test Facility
NBTF
F4E-OFC
SPIDER Diagnostics
MITICA Diagnostics
MITICA prototype probes
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/406533
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact