This document reports on the site acceptance tests of the SPIDER and MITICA CODAS interface with the Chemical Control System (CCS) of the Shared Cooling Plant (CP). Tests have been carried out from 4 December 2019 to 11 December 2019.The main purpose of these tests was to check the process variable exchange and the remote sequences in Short-term Maintenance of the chemical control system of the Cooling plant integrated whit SPIDER/MITICA/PRIMA CODAS.The tests of remote sequences were executed by setting the state transition requests through the CODAS graphical interface.

SPIDER and MITICA CODAS interface with the Chemical Control System (CCS) of the Shared Cooling System - Test Report

Simionato P
2019

Abstract

This document reports on the site acceptance tests of the SPIDER and MITICA CODAS interface with the Chemical Control System (CCS) of the Shared Cooling Plant (CP). Tests have been carried out from 4 December 2019 to 11 December 2019.The main purpose of these tests was to check the process variable exchange and the remote sequences in Short-term Maintenance of the chemical control system of the Cooling plant integrated whit SPIDER/MITICA/PRIMA CODAS.The tests of remote sequences were executed by setting the state transition requests through the CODAS graphical interface.
2019
Istituto gas ionizzati - IGI - Sede Padova
Istituto per la Scienza e Tecnologia dei Plasmi - ISTP
Rapporto finale di progetto
Neutral Beam Test Facility
NBTF
F4E-OFC
PRIMA
NBTF Control Interlock and Safety
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/411748
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact