This document reports the as-built design of the SPIDER/PRIMA CODAS interface with SPIDER/Shared Cooling Plant.It includes also the Chemical Control System (CCS)that was not defined in the previous version.

PRIMA Plant System CODAS - PRIMA Cooling Plant - As-built design report

Luchetta A
2020

Abstract

This document reports the as-built design of the SPIDER/PRIMA CODAS interface with SPIDER/Shared Cooling Plant.It includes also the Chemical Control System (CCS)that was not defined in the previous version.
2020
Istituto per la Scienza e Tecnologia dei Plasmi - ISTP
Rapporto finale di progetto
Neutral Beam Test Facility
NBTF
F4E-OFC
PRIMA
NBTF Control Interlock and Safety
PRIMA Cooling Plant
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/411750
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact