This document is the manufacturing design of the safety items included in the specific contract F4E-OFC-280-03-It does not include the manufacturing design of surveillance camera system that is managed through a different document (F4E_D_2FHBGN v2.0). The document is aligned with the contractual deviation SDR#:60775 approved on 9 Dec. 2019.

Manufacturing Design of SPIDER/MITICA Safety Items

Grando L;
2019

Abstract

This document is the manufacturing design of the safety items included in the specific contract F4E-OFC-280-03-It does not include the manufacturing design of surveillance camera system that is managed through a different document (F4E_D_2FHBGN v2.0). The document is aligned with the contractual deviation SDR#:60775 approved on 9 Dec. 2019.
2019
Istituto per la Scienza e Tecnologia dei Plasmi - ISTP
Rapporto finale di progetto
NBTF
Neutral Beam Test Facility
PRIMA
ITER
F4E-OFC
NBTF Control and Data Acquisition Interlock and Safety
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/424463
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact