This Inspection Report describes the BLCs box dimensions as-installed on-site in its final position. The assembly of the pipe-bellow connecting the BLC box to the Mitica Beam Line Vessel is not performed at this stage due to constrains of the Mitica overall schedule, however the dimensions included in this document show the assemblability of this component that will be done at a later stage.

METROLOGY REPORT OF THE BLC BOX AS-INSTALLED ON SITE

Degli Agostini F;
2022

Abstract

This Inspection Report describes the BLCs box dimensions as-installed on-site in its final position. The assembly of the pipe-bellow connecting the BLC box to the Mitica Beam Line Vessel is not performed at this stage due to constrains of the Mitica overall schedule, however the dimensions included in this document show the assemblability of this component that will be done at a later stage.
2022
Istituto per la Scienza e Tecnologia dei Plasmi - ISTP
Rapporto finale di progetto
Neutral beam injection
NBI
Metrology
BLC Box
Consorzio RFX
F4E
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/462211
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact