This Inspection Report describes the BLCs box dimensions as-installed on-site in its final position. The assembly of the pipe-bellow connecting the BLC box to the Mitica Beam Line Vessel is not performed at this stage due to constrains of the Mitica overall schedule, however the dimensions included in this document show the assemblability of this component that will be done at a later stage.
METROLOGY REPORT OF THE BLC BOX AS-INSTALLED ON SITE
Degli Agostini F;
2022
Abstract
This Inspection Report describes the BLCs box dimensions as-installed on-site in its final position. The assembly of the pipe-bellow connecting the BLC box to the Mitica Beam Line Vessel is not performed at this stage due to constrains of the Mitica overall schedule, however the dimensions included in this document show the assemblability of this component that will be done at a later stage.File in questo prodotto: