SunHorizon (SH) will demonstrate up to TRL 7 innovative, reliable, cost-effective coupling of solar and HP technologies. SunHorizon addresses three main research pillars that interact each other towards project objectives achievement, demonstration and replication: i) optimized design, engineering and manufacturing of SunHorizon technologies, ii) smart functional monitoring for H&C, iii) Key Performance Indicators (KPI) driven management and demonstration. T2.4 established a list of indicators to assess the performances of SunHorizon standalone technology and combined packages during their operational phase and for the simulation scenarios to achieve project objectives. In order to calculate these KPIs, within WP4 a proactive KPI-based tool has been developed. The KPI-based maintenance tool will automatically calculate the KPIs of each demo site. T6.4 aims at demonstrating that the actual KPIs are being achieved, and what are the deviations from the grant agreement. The first deliverable is deliverable D6.4, in which the methodology to report KPIs and PIs were reported. Now in D6.6 the following activities have been conducted: Review of monitoring data production, collection and operation summary report of the SunHorizon installed TPs Reporting monitoring and operation summary (KPIs) The present document will report the operation summary of the demos over the past months (summer period) and detect ways to improve the data collection and control of the TPs.

Progetto SUNHORIZON - D6.6 - Final Report on SunHorizon monitoring activities - RE-63/24

Giuseppe Dino;Andrea Frazzica
2023

Abstract

SunHorizon (SH) will demonstrate up to TRL 7 innovative, reliable, cost-effective coupling of solar and HP technologies. SunHorizon addresses three main research pillars that interact each other towards project objectives achievement, demonstration and replication: i) optimized design, engineering and manufacturing of SunHorizon technologies, ii) smart functional monitoring for H&C, iii) Key Performance Indicators (KPI) driven management and demonstration. T2.4 established a list of indicators to assess the performances of SunHorizon standalone technology and combined packages during their operational phase and for the simulation scenarios to achieve project objectives. In order to calculate these KPIs, within WP4 a proactive KPI-based tool has been developed. The KPI-based maintenance tool will automatically calculate the KPIs of each demo site. T6.4 aims at demonstrating that the actual KPIs are being achieved, and what are the deviations from the grant agreement. The first deliverable is deliverable D6.4, in which the methodology to report KPIs and PIs were reported. Now in D6.6 the following activities have been conducted: Review of monitoring data production, collection and operation summary report of the SunHorizon installed TPs Reporting monitoring and operation summary (KPIs) The present document will report the operation summary of the demos over the past months (summer period) and detect ways to improve the data collection and control of the TPs.
2023
Istituto di Tecnologie Avanzate per l'Energia - ITAE
Rapporto intermedio di progetto
Key performance indicators, monitoring campaign, project demonstration, project results, project impacts
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/518554
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ente

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact