This document is related to Task2 (Deliverable D6) of the study Technical Support for the Long-Term Deployment of an L-Band Radiometer at Concordia Station. It contains the annual Report of the Domex-3 Experiment. In the document is described the execution of the work carried out in the twelfth experimental year of the project (i.e. from January to December 2024). It includes the description data acquired after the installation of the microwave isolators together with antenna switches for improving absolute calibration. Data analysis and Data Processing Report is also reported here.
Technical Support for the Long-Term Deployment of an L-Band Radiometer at Concordia Station
Francesco Montomoli;Giovanni Macelloni;Marco Brogioni;Massimo Baldi;Saverio Priori
2025
Abstract
This document is related to Task2 (Deliverable D6) of the study Technical Support for the Long-Term Deployment of an L-Band Radiometer at Concordia Station. It contains the annual Report of the Domex-3 Experiment. In the document is described the execution of the work carried out in the twelfth experimental year of the project (i.e. from January to December 2024). It includes the description data acquired after the installation of the microwave isolators together with antenna switches for improving absolute calibration. Data analysis and Data Processing Report is also reported here.File in questo prodotto:
| File | Dimensione | Formato | |
|---|---|---|---|
|
DOMEX3_2024_v4_rev2 SELECTED PAGES.pdf
accesso aperto
Tipologia:
Abstract
Licenza:
Altro tipo di licenza
Dimensione
540.76 kB
Formato
Adobe PDF
|
540.76 kB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.


