In order perform the different set of measurements needed for the resistance and the seakeeping tests, and also due to fact that differences between model A and B are extremely small, the decision has been taken to build two different models: a large B model for the resistance tests and a smaller B model for the seakeeping tests. Both the models are obtained via a small modification of existing A models. Models C and D will be built from scratch.
EUCLID Research Project RTP 10.14 - Final Report for EWP1.2
2000
Abstract
In order perform the different set of measurements needed for the resistance and the seakeeping tests, and also due to fact that differences between model A and B are extremely small, the decision has been taken to build two different models: a large B model for the resistance tests and a smaller B model for the seakeeping tests. Both the models are obtained via a small modification of existing A models. Models C and D will be built from scratch.File in questo prodotto:
Non ci sono file associati a questo prodotto.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.


