FRATINI, SIMONE
FRATINI, SIMONE
Istituto di Scienze e Tecnologie della Cognizione - ISTC
Controlling Complex Physical Systems Through Planning and Scheduling Integration
2005 Cesta A;Fratini; S
Deploying Interactive Mission Planning Tools - Experiences and Lessons Learned
2011 Cesta, Amedeo; Cortellessa, Gabriella; Fratini, Simone; Oddi, Angelo; Bernardi, Giulio
Flexible Plan Verification: Feasibility Results
2011 Cesta, Amedeo; Finzi, Alberto; Fratini, Simone; Orlandini, Andrea; Tronci, Enrico
From Demo to Practice: the MEXAR Path to Space Operations
2006 Cesta A; Cortellessa G; Fratini S; Oddi A;Policella; N
MEXAR2: AI Solves Mission Planner Problems
2007 Cesta, A; Cortellessa, G; Denis, M; Donati, A; Fratini, S; Oddi, A; Policella, N; Rabenau, E; Schulster, J
MrSPOCK: Steps in Developing an End-to-End Space Application
2011 Cesta, Amedeo; Cortellessa, Gabriella; Fratini, Simone; Oddi, Angelo
Optical properties of lattice/magnetic small polarons from DMFT
2008 Ciuchi, S; Cappelluti, E; Fratini, S
Planning with Multiple-Components in OMPS
2008 Cesta A; Fratini S;Pecora; F
The Third Competition on Knowledge Engineering for Planning and Scheduling
2010 Bartak, R; Fratini, S; Mccluskey, ; L,
Unifying Planning and Scheduling as Timelines in a Component-Based Perspective
2008 Fratini, S; Pecora, F; Cesta, Amedeo; A,
Validation and Verification Issues in a Timeline-Based Planning System
2010 Cesta, A; Finzi, A; Fratini, S; Orlandini, A; Tronci, ; E,
Titolo | Data di pubblicazione | Autore(i) | File |
---|---|---|---|
Controlling Complex Physical Systems Through Planning and Scheduling Integration | 1-gen-2005 | Cesta A;Fratini; S | |
Deploying Interactive Mission Planning Tools - Experiences and Lessons Learned | 1-gen-2011 | Cesta, Amedeo; Cortellessa, Gabriella; Fratini, Simone; Oddi, Angelo; Bernardi, Giulio | |
Flexible Plan Verification: Feasibility Results | 1-gen-2011 | Cesta, Amedeo; Finzi, Alberto; Fratini, Simone; Orlandini, Andrea; Tronci, Enrico | |
From Demo to Practice: the MEXAR Path to Space Operations | 1-gen-2006 | Cesta A; Cortellessa G; Fratini S; Oddi A;Policella; N | |
MEXAR2: AI Solves Mission Planner Problems | 1-gen-2007 | Cesta, A; Cortellessa, G; Denis, M; Donati, A; Fratini, S; Oddi, A; Policella, N; Rabenau, E; Schulster, J | |
MrSPOCK: Steps in Developing an End-to-End Space Application | 1-gen-2011 | Cesta, Amedeo; Cortellessa, Gabriella; Fratini, Simone; Oddi, Angelo | |
Optical properties of lattice/magnetic small polarons from DMFT | 1-gen-2008 | Ciuchi, S; Cappelluti, E; Fratini, S | |
Planning with Multiple-Components in OMPS | 1-gen-2008 | Cesta A; Fratini S;Pecora; F | |
The Third Competition on Knowledge Engineering for Planning and Scheduling | 1-gen-2010 | Bartak, R; Fratini, S; Mccluskey, ; L, | |
Unifying Planning and Scheduling as Timelines in a Component-Based Perspective | 1-gen-2008 | Fratini, S; Pecora, F; Cesta, Amedeo; A, | |
Validation and Verification Issues in a Timeline-Based Planning System | 1-gen-2010 | Cesta, A; Finzi, A; Fratini, S; Orlandini, A; Tronci, ; E, |