In this paper we integrate at the tactical level two decision problems arising in container terminals: the berth allocation problem, which consists of assigning and scheduling incom- ing ships to berthing positions, and the quay crane assignment problem, which assigns to incoming ships a certain quay crane profile (i.e. number of quay cranes per working shift). We present two formulations: a mixed integer quadratic program and a linearization which reduces to a mixed integer linear program. The objective function aims, on the one hand, to maximize the total value of chosen quay crane profiles and, on the other hand, to minimize the housekeeping costs generated by transshipment flows between ships. To solve the problem we developed a heuristic algorithm which combines tabu search meth- ods and mathematical programming techniques. Computational results on instances based on real data are presented and compared to those obtained through a commercial solver.

Modeling and Solving the Tactical Berth Allocation Problem

L Moccia;
2010

Abstract

In this paper we integrate at the tactical level two decision problems arising in container terminals: the berth allocation problem, which consists of assigning and scheduling incom- ing ships to berthing positions, and the quay crane assignment problem, which assigns to incoming ships a certain quay crane profile (i.e. number of quay cranes per working shift). We present two formulations: a mixed integer quadratic program and a linearization which reduces to a mixed integer linear program. The objective function aims, on the one hand, to maximize the total value of chosen quay crane profiles and, on the other hand, to minimize the housekeeping costs generated by transshipment flows between ships. To solve the problem we developed a heuristic algorithm which combines tabu search meth- ods and mathematical programming techniques. Computational results on instances based on real data are presented and compared to those obtained through a commercial solver.
2010
Istituto di Calcolo e Reti ad Alte Prestazioni - ICAR
Berth allocation
Quay crane assignment
Container terminal management
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/119008
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 207
  • ???jsp.display-item.citation.isi??? 187
social impact