A collaborative effort between European research Associations and Thales Electron Devices (TED) has been launched by the European Fusion Development Agreement (EFDA) in 2003, aiming at the development of an industrial 170GHz/2MW/CW coaxial cavity gyrotron. The first prototype is expected to reach 2MW/1s and is presently being tested in Lausanne at a dedicated test facility. The test facility has been designed to be flexible: allowing the possible commissioning of tubes with different characteristics, as well the tests of a version of the ITER upper launcher antenna at full performances. The test facility has been commissioned during the first test phases on the gyrotron which include: high voltage stand-off, coaxial insert alignment and cathode conditioning without depressed collector power supply at a slightly reduced electron beam power of 85kV/78A/2ms. The short pulse (<5ms) operation of the gyrotron has demonstrated stable single mode operation in the designed TE(-34,19) mode at RF power levels in excess of 1.4MW, at below nominal electron beam parameters (79kV/75A). Further RF optimization in view of reaching the nominal beam parameters of 90kV/75A is presently underway and the status of the short pulse (< 100ms) experimental results will be reported.

STATUS OF DEVELOPMENT OF THE 2MW, 170GHz COAXIAL-CAVITY GYROTRON FOR ITER

Bin W;Bruschi A;Cirant S;Gandini F;
2008

Abstract

A collaborative effort between European research Associations and Thales Electron Devices (TED) has been launched by the European Fusion Development Agreement (EFDA) in 2003, aiming at the development of an industrial 170GHz/2MW/CW coaxial cavity gyrotron. The first prototype is expected to reach 2MW/1s and is presently being tested in Lausanne at a dedicated test facility. The test facility has been designed to be flexible: allowing the possible commissioning of tubes with different characteristics, as well the tests of a version of the ITER upper launcher antenna at full performances. The test facility has been commissioned during the first test phases on the gyrotron which include: high voltage stand-off, coaxial insert alignment and cathode conditioning without depressed collector power supply at a slightly reduced electron beam power of 85kV/78A/2ms. The short pulse (<5ms) operation of the gyrotron has demonstrated stable single mode operation in the designed TE(-34,19) mode at RF power levels in excess of 1.4MW, at below nominal electron beam parameters (79kV/75A). Further RF optimization in view of reaching the nominal beam parameters of 90kV/75A is presently underway and the status of the short pulse (< 100ms) experimental results will be reported.
2008
Istituto di fisica del plasma - IFP - Sede Milano
978-1-4244-2119-0
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/126831
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 4
  • ???jsp.display-item.citation.isi??? 0
social impact