The NIO1 (Negative Ion Optimization phase 1) project consists of a multiaperture negative ion source mounted on a 60 kV accelerating column; up to 9 beamlets (15 mA H- each one) arranged in 3 x 3 matrix with 14 mm spacing can be extracted. The moderate size and the modular concept make some relative rotation of the source magnetic filter and the electrodes possible, so that the effect of crossed and aligned field can be easily compared. Other goals of source experimental program are emittance (and beam profile) measurement at several distances (for simulation code validation), testing of diagnostic components and of radiofrequency coupling. A full set of construction drawing was completed; also the Fast Emittance Scanner (FES) and its vacuum chambers were built (four mounting positions are reserved to FES). Some low power rf matching boxes were developed for a test plasma, approximately half the source size. A cesium oven compatible with NIO1 is being also developed; by using some industrial standard 100 W heaters (with a proper driver) a careful control of temperature is planned.

Status of NIO1 construction

G Serianni;V Antoni;M Recchia;
2011

Abstract

The NIO1 (Negative Ion Optimization phase 1) project consists of a multiaperture negative ion source mounted on a 60 kV accelerating column; up to 9 beamlets (15 mA H- each one) arranged in 3 x 3 matrix with 14 mm spacing can be extracted. The moderate size and the modular concept make some relative rotation of the source magnetic filter and the electrodes possible, so that the effect of crossed and aligned field can be easily compared. Other goals of source experimental program are emittance (and beam profile) measurement at several distances (for simulation code validation), testing of diagnostic components and of radiofrequency coupling. A full set of construction drawing was completed; also the Fast Emittance Scanner (FES) and its vacuum chambers were built (four mounting positions are reserved to FES). Some low power rf matching boxes were developed for a test plasma, approximately half the source size. A cesium oven compatible with NIO1 is being also developed; by using some industrial standard 100 W heaters (with a proper driver) a careful control of temperature is planned.
2011
Istituto gas ionizzati - IGI - Sede Padova
978-0-7354-0955-2
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/229135
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 6
  • ???jsp.display-item.citation.isi??? 6
social impact