The electron beam energy monitoring device, previously developed and tested under standard laboratory conditions using electron beams in the energy range 4-12 MeV, has now been tested under industrial irradiation conditions in high-energy, high-power electron beam facilities. The measuring instrument was improved in order to measure high peak current delivered at low pulse repetition rate as well. Tests, with good results, were carried out at two different EB plants: one equipped with a LUE-8 linear electron accelerator of 7 MeV maximum energy used for cross-linking of cables and for medical device sterilization, and the other with a 10 MeV Rhodotron type TT 100 used for in-house sterilization. © 2009 Elsevier Ltd. All rights reserved.
Evaluation test of the energy monitoring device in industrial electron beam facilities
M Lavalle;A Martelli;
2009
Abstract
The electron beam energy monitoring device, previously developed and tested under standard laboratory conditions using electron beams in the energy range 4-12 MeV, has now been tested under industrial irradiation conditions in high-energy, high-power electron beam facilities. The measuring instrument was improved in order to measure high peak current delivered at low pulse repetition rate as well. Tests, with good results, were carried out at two different EB plants: one equipped with a LUE-8 linear electron accelerator of 7 MeV maximum energy used for cross-linking of cables and for medical device sterilization, and the other with a 10 MeV Rhodotron type TT 100 used for in-house sterilization. © 2009 Elsevier Ltd. All rights reserved.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.