This report describes the activities carried out at the High Voltage Padova Test Facility HVPTF in 2015. The activities were focused mainly: to support the R&D of the MITICA post insulators, to repair a lea kage of insulating oil from both power supplies feedthrough s, to improve the acquisition system and to continu e the high voltage test program with different electrode shapes and gap lengths, in double polarity configuration.

High Voltage Test facility campaign report 2015

Fincato M;Rizzieri R;Cervaro V;Barbato P;Carraro M;Taliercio C;
2015

Abstract

This report describes the activities carried out at the High Voltage Padova Test Facility HVPTF in 2015. The activities were focused mainly: to support the R&D of the MITICA post insulators, to repair a lea kage of insulating oil from both power supplies feedthrough s, to improve the acquisition system and to continu e the high voltage test program with different electrode shapes and gap lengths, in double polarity configuration.
2015
Istituto gas ionizzati - IGI - Sede Padova
Rapporto finale di progetto
HV
High Voltage
HVTF
High Voltage Test Facility
NBTF
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/313704
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact