In this work a back to back method is presented which allows to develop heating tests of prefabricated secondary substations with a limited number of supplying equipment (an induction regulator and a capacitor bank). The proposed method makes use of the transformer tap changers to create a voltage difference on the medium voltage side. In this way, only an adjunctive low voltage supply is needed. With the proposed test system, the heating tests are developed on a 1000 kVA prefabricated substation. Thanks to the experimental tests, the class of enclosure of the substation and the operating temperature and resistance of the power transformers are determined, according to the recommendations of the standards EN 62271-202 and EN 60076-2. Beside the traditional tests prescribed by the standards, a thermographic analysis of the substation under test is also performed. The simplicity of this analysis suggests its usefulness as pre-compliance test, which can be also performed in manufacturer laboratories.

A back to back method for the temperature rise test of prefabricated substations: A case study

Di Cara Dario;Tine Giovanni;
2015

Abstract

In this work a back to back method is presented which allows to develop heating tests of prefabricated secondary substations with a limited number of supplying equipment (an induction regulator and a capacitor bank). The proposed method makes use of the transformer tap changers to create a voltage difference on the medium voltage side. In this way, only an adjunctive low voltage supply is needed. With the proposed test system, the heating tests are developed on a 1000 kVA prefabricated substation. Thanks to the experimental tests, the class of enclosure of the substation and the operating temperature and resistance of the power transformers are determined, according to the recommendations of the standards EN 62271-202 and EN 60076-2. Beside the traditional tests prescribed by the standards, a thermographic analysis of the substation under test is also performed. The simplicity of this analysis suggests its usefulness as pre-compliance test, which can be also performed in manufacturer laboratories.
2015
Istituto di Studi sui Sistemi Intelligenti per l'Automazione - ISSIA - Sede Bari
Inglese
4th International Conference on Renewable Energy Research and Applications, ICRERA 2015,
1635
1640
9781479999828
http://www.scopus.com/record/display.url?eid=2-s2.0-84964645064&origin=inward
Sì, ma tipo non specificato
Nov. 22-25, 2015
Palermo, Italy,
heating test
power transformer
prefabricated substation
temperature rise
8
none
Cangemi, Giovanni; Cipriani, Giovanni; Di Dio, Vincenzo; Miceli, Rosario; Nuccio, Salvatore; DI CARA, Dario; Tine, Giovanni; Melodia, Mario
273
info:eu-repo/semantics/conferenceObject
04 Contributo in convegno::04.01 Contributo in Atti di convegno
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/316828
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 2
  • ???jsp.display-item.citation.isi??? ND
social impact