The upgrade of the electron cyclotron (EC) system of the TCV tokamak has entered in its realization phase. The MW-class dual-frequency gyrotron design (84 or 126GHz/2s), based on the 140GHz W7-X gyrotron, is finalized and a contract for the manufacturing of two units has been placed with Thales Electron Devices (TED). For maintaining a high level of operational flexibility of the EC-system the integration of the dual-frequency gyrotrons adds a significant complexity in the evacuated HE11 transmission line system connected to the various TCV low-field side and top launchers. Specific aspects of the gyrotrons design and their integration into the EC-system are described. The EC-system upgrade is an essential step of a larger extent upgrade of TCV.
Progress on the upgrade of the TCV EC-system with two 1MW dual-frequency gyrotrons
Bin W;Garavaglia S;Moro A;
2016
Abstract
The upgrade of the electron cyclotron (EC) system of the TCV tokamak has entered in its realization phase. The MW-class dual-frequency gyrotron design (84 or 126GHz/2s), based on the 140GHz W7-X gyrotron, is finalized and a contract for the manufacturing of two units has been placed with Thales Electron Devices (TED). For maintaining a high level of operational flexibility of the EC-system the integration of the dual-frequency gyrotrons adds a significant complexity in the evacuated HE11 transmission line system connected to the various TCV low-field side and top launchers. Specific aspects of the gyrotrons design and their integration into the EC-system are described. The EC-system upgrade is an essential step of a larger extent upgrade of TCV.File | Dimensione | Formato | |
---|---|---|---|
prod_368700-doc_122309.pdf
solo utenti autorizzati
Descrizione: Articolo pubblicato
Tipologia:
Versione Editoriale (PDF)
Dimensione
1.37 MB
Formato
Adobe PDF
|
1.37 MB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.