The authors conducted a comparative study of continuous timing and work sampling, as applied by different observers. Twelve researchers were split into two groups and carried out the same study, switching method every half an hour. The study lasted 3 hours, corresponding to 6 iterations (3 iterations per method). Statistical analysis of data confirmed that both methods may determine elemental breakdown with the same accuracy. Observer-induced variability had a minor effect, and only on those time elements that were short and occurred less frequently. Error increased as the study progressed, as the likely result of observer fatigue. Again, this trend was significant for short elements and not significant for longer ones. This study may offer a warning against over-detailing elemental breakdown. Work cycles should be split in as many elements as strictly necessary for achieving the specific purpose of the study. Splitting them in too many elements just for the sake of description is counterproductive, because it places an excessive strain on the observer and it may increase the risk of errors. A simple study design will facilitate replication by a number of different researchers, regardless of method.

Determining observer and method effects on the accuracy of elemental time studies in forest operations

Spinelli R;Magagnotti N;
2013

Abstract

The authors conducted a comparative study of continuous timing and work sampling, as applied by different observers. Twelve researchers were split into two groups and carried out the same study, switching method every half an hour. The study lasted 3 hours, corresponding to 6 iterations (3 iterations per method). Statistical analysis of data confirmed that both methods may determine elemental breakdown with the same accuracy. Observer-induced variability had a minor effect, and only on those time elements that were short and occurred less frequently. Error increased as the study progressed, as the likely result of observer fatigue. Again, this trend was significant for short elements and not significant for longer ones. This study may offer a warning against over-detailing elemental breakdown. Work cycles should be split in as many elements as strictly necessary for achieving the specific purpose of the study. Splitting them in too many elements just for the sake of description is counterproductive, because it places an excessive strain on the observer and it may increase the risk of errors. A simple study design will facilitate replication by a number of different researchers, regardless of method.
2013
Istituto per la Valorizzazione del Legno e delle Specie Arboree - IVALSA - Sede Sesto Fiorentino
Accuracy
Methodology
Operations
Time studies
Work sampling
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/340349
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 19
  • ???jsp.display-item.citation.isi??? 18
social impact