The European 1 MW, 170 GHz CW industrial prototype gyrotron for ECRH&CD on ITER was under test at the KIT test facility during 2016. In order to optimize the gyrotron operation, the tube was thoroughly tested in the short-pulse regime, with pulse lengths below 10 ms, for a wide range of operational parameters. The operation was extended to longer pulses with a duration of up to 180 s. In this work we present in detail the achievements and the challenges that were faced during the long-pulse experimental campaign.
Experimental Results of the EU ITER Prototype Gyrotrons
Bin W;Bruschi A;Fanale F;Lontano M;
2017
Abstract
The European 1 MW, 170 GHz CW industrial prototype gyrotron for ECRH&CD on ITER was under test at the KIT test facility during 2016. In order to optimize the gyrotron operation, the tube was thoroughly tested in the short-pulse regime, with pulse lengths below 10 ms, for a wide range of operational parameters. The operation was extended to longer pulses with a duration of up to 180 s. In this work we present in detail the achievements and the challenges that were faced during the long-pulse experimental campaign.File in questo prodotto:
| File | Dimensione | Formato | |
|---|---|---|---|
|
prod_396227-doc_137180.pdf
solo utenti autorizzati
Descrizione: Paper pubblicato
Tipologia:
Versione Editoriale (PDF)
Dimensione
331.1 kB
Formato
Adobe PDF
|
331.1 kB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.


