SPIDER is one of the two projects of the ITER Neutral Beam Test Facility (NBTF) under construction in Padova, Italy, at Consorzio RFX premises; it is the full-size prototype of the radiofrequency (RF) ion source for ITER Neutral Beam Injector (NBI), with beam energy of 100keV, designed to operate with pulse length up to 3600 s, featuring ITER-like filter field configuration, caesium oven layout and a wide set of diagnostics. These features will allow reproducing the ion source operation like in ITER as cannot be done in any other existing test facility. SPIDER realization is well advanced and the first operation is expected at the beginning of 2018, with the mission to prove the possibility of achieving the ITER NBI ion source target requirements and of improving its performance in terms of reliability and availability. This paper mainly focuses on the preparation of the first SPIDER operations: integration and testing of SPIDER components, completion and implementation of diagnostics and control and workout of operation and research plan, based on a staged strategy.

The ITER Neutral Beam Test Facility toward SPIDER Operation

Toigo V;E Gaio;A Luchetta;R Pasqualotto;P Zaccaria;N Pomaro;G Serianni;P Agostinetti;M Agostini;V Antoni;M Barbisan;M Brombin;M Dalla Palma;A De Lorenzi;L Grando;G Manduchi;R Piovan;M Recchia;S Spagnolo;M Spolaore;C Taliercio;M Zaupa;M Rebai;A Muraro;
2016

Abstract

SPIDER is one of the two projects of the ITER Neutral Beam Test Facility (NBTF) under construction in Padova, Italy, at Consorzio RFX premises; it is the full-size prototype of the radiofrequency (RF) ion source for ITER Neutral Beam Injector (NBI), with beam energy of 100keV, designed to operate with pulse length up to 3600 s, featuring ITER-like filter field configuration, caesium oven layout and a wide set of diagnostics. These features will allow reproducing the ion source operation like in ITER as cannot be done in any other existing test facility. SPIDER realization is well advanced and the first operation is expected at the beginning of 2018, with the mission to prove the possibility of achieving the ITER NBI ion source target requirements and of improving its performance in terms of reliability and availability. This paper mainly focuses on the preparation of the first SPIDER operations: integration and testing of SPIDER components, completion and implementation of diagnostics and control and workout of operation and research plan, based on a staged strategy.
2016
Istituto gas ionizzati - IGI - Sede Padova
-
File in questo prodotto:
File Dimensione Formato  
prod_368170-doc_121970.pdf

solo utenti autorizzati

Descrizione: The ITER Neutral Beam Test Facility toward SPIDER operation
Tipologia: Documento in Pre-print
Dimensione 909.61 kB
Formato Adobe PDF
909.61 kB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/358604
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact