The Acceleration Grid Power Supply Conversion System (AGPS-CS) of the MITICA Neutral Beam Injector has been installed between late 2017 - early 2018 and commissioned in the first half of 2018. This paper is focused on the installation and commissioning activities, with emphasis on the integration issues. The results of the site and acceptance tests are presented, proving the capability of the system to deliver the specified performance.

Acceleration grid power supply conversion system of the MITICA neutral beam injector: On site integration activities and tests

Toigo V;
2019

Abstract

The Acceleration Grid Power Supply Conversion System (AGPS-CS) of the MITICA Neutral Beam Injector has been installed between late 2017 - early 2018 and commissioned in the first half of 2018. This paper is focused on the installation and commissioning activities, with emphasis on the integration issues. The results of the site and acceptance tests are presented, proving the capability of the system to deliver the specified performance.
2019
Istituto gas ionizzati - IGI - Sede Padova
ITER
MITICA
Neutral beam injector
Power supply
Acceleration grid power supply
IGCT
Inverter
Ac/dc converter
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/367855
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 9
  • ???jsp.display-item.citation.isi??? 9
social impact