An early attention to the layout of both plant site and its buildings is essential in a complex plant under preliminary design as DEMO in order to meet the assigned targets, namely i) the licensing requirements ii) a good availability in delivery electricity to the grid. The layout definition has to follow several criteria that become more complex and stringent for nuclear buildings, e.g. functional, maintenance, fire protection, safety, human factors, shielding, and remote handling. The criterion As Low As Reasonable Achievable with respect to the dose to the staff has to be applied in design, operation, maintenance and decommissioning phases. The tokamak building, where several complex systems have to converge to the torus to create and control the plasma, to take out its energy and to produce and extract tritium, provides the second and ultimate confinement barrier between the environment and the hazardous and radioactive materials present inside that might be mobilised, in case of accident, by the high energetic fluids stored in DEMO systems. The layout criteria are focused on avoiding any challenge to the safety functions: e.g. no common mode failures of the safety classified systems for all reference design basis events. Furthermore the safety classified equipment have to maintain their safety function all over the plant life in such challenging environmental conditions; an accurate layout might allow the qualification possible, making milder the environment, e.g. defining adequate shielding and areas where radiation dose, magnetic field and accidental environmental conditions are reasonable for sensible equipment. The experience of NPPs and ITER is also recognized as the basis of such design criteria for DEMO. The paper will outline the main design basis events and the layout criteria presenting some applications for the tokamak building that reflect the recent progress of the DEMO design.

EU DEMO Plant and Building Layout Criteria

Gaio E;
2019

Abstract

An early attention to the layout of both plant site and its buildings is essential in a complex plant under preliminary design as DEMO in order to meet the assigned targets, namely i) the licensing requirements ii) a good availability in delivery electricity to the grid. The layout definition has to follow several criteria that become more complex and stringent for nuclear buildings, e.g. functional, maintenance, fire protection, safety, human factors, shielding, and remote handling. The criterion As Low As Reasonable Achievable with respect to the dose to the staff has to be applied in design, operation, maintenance and decommissioning phases. The tokamak building, where several complex systems have to converge to the torus to create and control the plasma, to take out its energy and to produce and extract tritium, provides the second and ultimate confinement barrier between the environment and the hazardous and radioactive materials present inside that might be mobilised, in case of accident, by the high energetic fluids stored in DEMO systems. The layout criteria are focused on avoiding any challenge to the safety functions: e.g. no common mode failures of the safety classified systems for all reference design basis events. Furthermore the safety classified equipment have to maintain their safety function all over the plant life in such challenging environmental conditions; an accurate layout might allow the qualification possible, making milder the environment, e.g. defining adequate shielding and areas where radiation dose, magnetic field and accidental environmental conditions are reasonable for sensible equipment. The experience of NPPs and ITER is also recognized as the basis of such design criteria for DEMO. The paper will outline the main design basis events and the layout criteria presenting some applications for the tokamak building that reflect the recent progress of the DEMO design.
2019
Istituto per la Scienza e Tecnologia dei Plasmi - ISTP
Inglese
14th International Symposium on Fusion Nuclear Technology (ISFNT 14)
http://isfnt-14.org/wp-content/uploads/ISFNT-14_Book_of_Abstracts.pdf
22-27 September 2019
Budapest, Hungary
Layout
safety
building
tokamak
criteria
P3-106 / Book of Abstracts page 221
11
info:eu-repo/semantics/conferenceObject
none
274
04 Contributo in convegno::04.02 Abstract in Atti di convegno
Ciattaglia, S; Federici, G; Barucca, L; De Magistris, M; Gaio, E; Gliss, C; Koerber, M; Moscato, I; Porfiri, Mt; Riedl, F; Tarallo, A
   Implementation of activities described in the Roadmap to Fusion during Horizon 2020 through a Joint programme of the members of the EUROfusion consortium
   EUROfusion
   H2020
   633053
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/390869
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact