A model is considered for representing recurrent precedence-constrained tasks that are to execute on multiprocessor platforms. A recurrent task is specified as a directed acyclic graph (DAG), a period, and a relative deadline. Each vertex of the DAG represents a sequential job, while the edges of the DAG represent precedence constraints between these jobs. All the jobs of the DAG are released simultaneously and need to complete execution within the specified relative deadline of their release. Each task may release jobs in this manner an unbounded number of times, with successive releases occurring at least the specified period apart. Conditional control structures are also allowed. The scheduling problem is to determine whether a set of such recurrent tasks can be scheduled to always meet all deadlines upon a specified number of identical processors. This problem is shown to be computationally intractable, but amenable to efficient approximate solutions. Earliest Deadline First (EDF) and Deadline Monotonic (DM) are shown to be good approximate global scheduling algorithms. Polynomial and pseudo-polynomial time schedulability tests, of differing effectiveness, are presented for determining whether a given task set can be scheduled by EDF or DM to always meet deadlines on a specified number of processors.

A generalized parallel task model for recurrent real-time processes

Bonifaci Vincenzo;
2019

Abstract

A model is considered for representing recurrent precedence-constrained tasks that are to execute on multiprocessor platforms. A recurrent task is specified as a directed acyclic graph (DAG), a period, and a relative deadline. Each vertex of the DAG represents a sequential job, while the edges of the DAG represent precedence constraints between these jobs. All the jobs of the DAG are released simultaneously and need to complete execution within the specified relative deadline of their release. Each task may release jobs in this manner an unbounded number of times, with successive releases occurring at least the specified period apart. Conditional control structures are also allowed. The scheduling problem is to determine whether a set of such recurrent tasks can be scheduled to always meet all deadlines upon a specified number of identical processors. This problem is shown to be computationally intractable, but amenable to efficient approximate solutions. Earliest Deadline First (EDF) and Deadline Monotonic (DM) are shown to be good approximate global scheduling algorithms. Polynomial and pseudo-polynomial time schedulability tests, of differing effectiveness, are presented for determining whether a given task set can be scheduled by EDF or DM to always meet deadlines on a specified number of processors.
2019
Istituto di Analisi dei Sistemi ed Informatica ''Antonio Ruberti'' - IASI
Approximation algorithm
Conditional control-flow
Directed acyclic graph
Multiprocessor platform
Precedence constraints
Schedulability test
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/393071
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 4
  • ???jsp.display-item.citation.isi??? 2
social impact