The important task (NBI neutral beam injector for fusion) and the complexity of radiofrequency ion source need large tests (as ELISE and SPIDER) and intermediate scale tests (as NIO1 in this poster) for optimization. Conditioning (with gas) was found necessary in Cs-free operation. Cs-based operation has begun: stability improves at lower oven temperature; in both cases, lateral view cameras show beam quality. Energy recovery plugin almost ready for NIO1 (or at a test station at TRIPS).

Progress on NIO1 ion source and on energy recover tests

Antoni V;Barbisan M;Serianni G;Taccogna F;
2021-01-01

Abstract

The important task (NBI neutral beam injector for fusion) and the complexity of radiofrequency ion source need large tests (as ELISE and SPIDER) and intermediate scale tests (as NIO1 in this poster) for optimization. Conditioning (with gas) was found necessary in Cs-free operation. Cs-based operation has begun: stability improves at lower oven temperature; in both cases, lateral view cameras show beam quality. Energy recovery plugin almost ready for NIO1 (or at a test station at TRIPS).
2021
Istituto per la Scienza e Tecnologia dei Plasmi - ISTP
NBI
neutral beam injection
NIO1 beam source
energy recovery
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14243/395610
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact