The EU 1 MW gyrotron for the ITER Electron Cyclotron Heating and Current Drive (EC H&CD) system has been developed in coordinated efforts from several EU institutions (EGYC) and with support of F4E. In a first experimental campaign the tube has been optimized in short pulse operation and has been conditioned for long pulse operation at the KIT teststand up to 180 s. In a second experimental campaign the tube has been transferred to SPC, EPFL, for operation in a dedicated super-conducting magnet at increased pulse length. This paper presents the main experimental results of the prototype tube achieved at KIT.
RECENT PROGRESS IN THE DEVELOPMENT OF THE EUROPEAN 1 MW, 170 GHZ CW GYROTRON FOR ITER
W Bin;A Bruschi;F Fanale;
2018
Abstract
The EU 1 MW gyrotron for the ITER Electron Cyclotron Heating and Current Drive (EC H&CD) system has been developed in coordinated efforts from several EU institutions (EGYC) and with support of F4E. In a first experimental campaign the tube has been optimized in short pulse operation and has been conditioned for long pulse operation at the KIT teststand up to 180 s. In a second experimental campaign the tube has been transferred to SPC, EPFL, for operation in a dedicated super-conducting magnet at increased pulse length. This paper presents the main experimental results of the prototype tube achieved at KIT.File in questo prodotto:
| File | Dimensione | Formato | |
|---|---|---|---|
|
prod_429606-doc_153383.pdf
solo utenti autorizzati
Descrizione: Paper pubblicato
Tipologia:
Versione Editoriale (PDF)
Dimensione
679.38 kB
Formato
Adobe PDF
|
679.38 kB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.


